Renewable Energy Development
Over 200MW Currently in Development
Over 100MW Owned By Partners
Over 1GW Developed So Far
At a time when farming is more difficult than ever, solar gives an opportunity to diversify your income. Lease terms are for a minimum of 25 years and generally for far more per acre, per year than agricultural rates. We also take care of any additional expenses and tax increases, any crop damage when we build and take care of all of the solar garden maintenance. All you have to do is sit back and collect the check.
Over 1GW Developed So Far
Demeter Land Development, LLC © 2021-2025. All rights reserved.
Generally 3 phase power lines are a series of 3 lines running on the top of a utility pole. Often times they look like a T with the lines running on top. Sometimes there are occasional exceptions to these configurations.
If the pole has only two wires near the top of the pole, with one above the other and there is no T-bar, this is a single phase line.
Wires not near the top of the pole should not be included in the total amount of wires as these are often for telecommunication lines and not power lines.